Generating the megawatts is the easy part. Settling them is the rail.
Every MWh routed to an AI compute load — terrestrial or orbital — needs a signed receipt. Capacity. Dispatch. Green attribute. Ancillary. Flex. Hive Grid issues an ML-DSA-65 signed receipt per primitive, anchored on Base, byte-match against FERC Order 2222 and the EU Network Code. Sub-second verification. Patent Pending · Filed 2026-05-08.
SpaceX has already put 110 MW of solar in orbit across 10,000 satellites. Gen3 targets a gigawatt. The harder problem isn't generating those megawatts — it's settling them. A 1 GW orbit-to-datacenter contract needs a signed receipt per MWh: who delivered, who dispatched, who carries the green attribute. The grid that ships in 2030 needs a receipt rail that already works in 2026.
Six signed primitives. One bearer-form instrument. Bytes match the regulator's wire.
Demand-response delivered
A signed receipt for every MWh of load shed or shifted under a DR program. OpenADR 3.0 native. Pairs with a VPP aggregator.
Capacity reserved, signed
Forward-capacity commitment receipt. Names the counterparty, the delivery window, the penalty schedule. ISO/RTO mappable.
Green attribute, attested
One MWh of clean generation, signed at the meter. The green attribute is bearer-form, transferable, audit-byte-match against M-RETS or WREGIS.
Frequency, voltage, reserves
A signed receipt for every ancillary service delivered into an ISO market. Regulation, spinning reserve, voltage support — each one a separate primitive.
The instruction, signed at the asset
The dispatch order — the moment the operator says "deliver" — signed and anchored. Resolves "who told the asset to do what, when" with no provider in the loop.
The queue, the study, the GIA
A signed receipt for each milestone in the interconnection process — queue position, feasibility study, GIA execution. Audit-grade evidence of every regulator-touched step.
The AI-compute power deals being signed in 2026 are too big to settle with a spreadsheet.
The supply chain is moving up.
SpaceX has put more than 100 MW of solar in orbit on gen2 Starlink. Gen3 targets a gigawatt class. Sun-synchronous orbit delivers up to 14× the per-panel yield of terrestrial solar for a continuously-running datacenter. The buyers are already at the table.
Per David Holz (Midjourney) · May 2026.The grid is hitting the ceiling.
Texas ERCOT has more than 20 GW of off-grid AI-datacenter capacity in development. Talen Energy's PJM nuclear PPA with Amazon is being re-litigated on "fair share." The questions regulators are asking right now are settlement questions: who delivered, who paid, who carries the green attribute.
The signature has to last.
A 30-year capacity contract or a 20-year PPA signed today with ECDSA will be quantum-forgeable inside the contract's audit-log retention window. Hive Grid signs every primitive with ML-DSA-65 — FIPS 204, NSA CNSA 2.0 listed — so the receipt that lands at FERC in 2034 still verifies.
Four steps from meter to settled receipt.
| Step | Actor | Artifact | What gets signed |
|---|---|---|---|
| 1 · Commit | Generator or load | SCU receipt | Capacity reserved, window, counterparty, penalty schedule |
| 2 · Dispatch | ISO or aggregator | SDR receipt | The instruction itself — "deliver N MW for T minutes starting at H" |
| 3 · Deliver | Asset (meter) | SFU / SGP / SAU receipt | MWh delivered, green attribute, ancillary service rendered |
| 4 · Settle | Counterparty | Bearer-form instrument | Composed primitives, byte-match against FERC / EU filing, anchored on Base |
Every receipt verifies in sub-second on a public chain. No provider has to be trusted to settle the trade.
Five buyer surfaces. One settlement rail.
Hyperscaler AI compute
Microsoft, Google, Amazon, Meta, xAI — every gigawatt of AI-compute power they sign needs SCU + SDR + SGP + SAU receipts to defend the green-attribute claim to regulators and shareholders.
IPP & nuclear
Talen, Constellation, Vistra, NRG — each PPA with a hyperscaler is being re-litigated on fair-share and grid burden. Signed primitives are the audit-grade artifact that survives the FERC challenge.
ISO/RTO & aggregators
CAISO, ERCOT, PJM, ISO-NE — FERC Order 2222 requires DER aggregation. Hive Grid is the OpenADR-3.0-native receipt rail every aggregator needs to settle into the wholesale market.
Orbital & space-based solar
SpaceX, Northrop Grumman, AST SpaceMobile, JAXA — the gigawatt-class orbit-to-ground contracts being negotiated today need a receipt rail that already works. Hive Grid is that rail.
Byte-match against the regulator's wire format. On day one.
FERC Order 2222 for DER aggregation. EU Network Code for cross-border attribute transfer. OpenADR 3.0 for dispatch. IEEE 2030.5 for asset telemetry. The receipt format does not require the regulator to adopt new software — it byte-matches what they already accept.
Scope a pilot.
One scoping call. We bring the receipt format and the settlement flow. You bring the MWh, the counterparty, and the regulator surface you need to defend in 2034.